Water Minister Inspects Beni Haroun Dam Pumping Station Serving Six Algerian Provinces
Water Minister Lounes Bouzegza inspected the main pumping station of the Beni Haroun Dam system in Mila, reaffirming the importance of preventive maintenance and operational readiness at one of Algeria’s largest strategic drinking water supply infrastructures.
By Dr. Hana Saada
ALGIERS — Minister of Water Resources Lounes Bouzegza conducted a working visit to Mila Province, where he inspected the main pumping station of the Beni Haroun Dam system, one of Algeria’s most strategic water supply infrastructures serving six provinces.
During the visit, the minister toured the principal pumping station, which forms part of the Beni Haroun hydraulic system responsible for supplying drinking water to the provinces of Mila, Constantine, Oum El Bouaghi, Batna, Khenchela and Jijel.
Bouzegza received a detailed technical briefing on the station’s operations, covering its operating mechanisms, maintenance procedures and preventive servicing programmes.
According to officials, the pumping station has a theoretical pumping capacity of 23 cubic metres per second, while its current daily water output stands at approximately one million cubic metres.
The minister was also briefed on the status of Beni Haroun Dam, whose current water reserves are estimated at approximately 830 million cubic metres.
During the inspection, Bouzegza stressed the importance of preserving the integrity of equipment and technical installations through regular preventive maintenance and ensuring immediate intervention whenever operational faults are detected.
He said such measures are essential to guaranteeing the uninterrupted delivery of public drinking water services while maintaining the operational readiness of one of the country’s most critical hydraulic facilities.
The minister also praised the Algerian engineers, technicians and workers operating the site, commending their professionalism, technical expertise and continued efforts in managing what he described as a strategic infrastructure that constitutes a cornerstone of water security for several provinces across the country.
— 𝐄𝐍𝐃 —

Dzair Tube Media Group | Record and Standing
Dzair Tube is a leading Algerian digital journalism platform, delivering high-quality content in Arabic, French, and English. With a daily readership exceeding 500,000, it has established itself among the country’s most influential media organizations.
Recognized for editorial excellence and integrity, Dzair Tube was awarded the President of the Republic’s Prize for Professional Journalist in the Electronic Press category on 22 October 2022. The platform operates from state-of-the-art studios, producing diverse programming across news, sports, culture, entertainment, and religion.
Dzair Tube maintains a robust digital presence, with over 600,000 YouTube subscribers, six million followers across Facebook pages, and more than 70,000 Instagram followers. Its sports daily, Dzair Sport, enjoys over 50,000 daily downloads via its official website, cementing its leadership in multimedia journalism.
Further recognized with the Media Leadership Award by former Minister of Communication Mohamed Laâgab and celebrated at the Hilals of Television awards, Dzair Tube continues to set benchmarks in innovation, influence, and public engagement, serving as a key forum for civic discourse, critical analysis, and public affairs.
Official website: www.dzair-tube.dz | English: www.dzair-tube.dz/en
